Electricity installation
Rosettes
DREAMHOUSE UAB have developed electricity installation system "Quick & Simple".
Main advantages:
- Time saving. No vertical drilling of logs needed - no electricity drawings needed when producing log construction in the factory.
- Flexibility. You can install extra rosettes afterwards any time and anywhere.
- Simplicity. Rosettes can be delivered already pre-installed in the wooden frame.
- Style. These rosettes are of the same style as other finishing materials we use in our buildings.
Switches
As the switches are commonly installed nearby the doors, wiring can be taken between the logs and door frame - no vertical drilling in logs needed!



Visit our showroom!
Become our partner - get discounts!